Hand-made wooden EV charger post
£750.00
(£900.00 Inc. VAT)
Available
This beautiful product would suit small or mid sized EV charge points. Shown here with a Simpson & Partner product, though suits any small or medium size charger.
- Hand made to order in East Sussex
- Sustainably sourced European Oak
- Highly durable exterior finish
- 5 year warranty
- Optional access panel in rear for electrical connections
- Foundation – we recommend the EV Kube foundation block shown below for this product.
- 200mm width
- Access panel to the rear for IP66 connection box
- Optional supply cable access hole can be drilled, if bottom cable entry is required for EV charger
- Minor customisation is possible, based on the EV charge point to be mounted. Please enquire.
Lead time 2-4 weeks from order.
Aftercare
Annual aftercare is essential for this product, especially if it’s situated in harsher conditions, especially coastal locations.
An annual clean and application of suitable osmo oil is best. The product is sent with printed instructions for aftercare and product recommendations.
Post moutning
Using the EV Kube product that’s recommended, installation is simple:
- Dig a hole in the ground for EV Kube foundation, according to EV Kube product instructions.
- Bring your cable and/ duct up through the EV Kube, leaving a minimum of 1.5m cable length above the ground
- Remove the EV Kube top plate
- Use postcrete of a similar product to secure the EV Kube foundation. Ensure a level footing and low to set
- The wooden post is built with 2-inch thick oak corners on the inside base section – the top plate of the EV Kube attaches to the base of the wooden post. There are pre-drilled pilot holes in these corners.
- A simple template is provided with the post for marking the drill points for EV Kube top plate. Position the template in the centre of the top plate and mark the drilling points. Use a suitable 4mm drill bit and drill through the top plate
- Use 100mm, 5mm width coach bolts to attach the top plate to the wooden post, locating into the pre-drilled pilot holes
- Lift the post + top plate assembly over the supply cable, to rest on the EV Kuke foundation base.
- Bring the 1.5m supply cable through the post and feed out through the cable exit hole at the top of the post.
- Use the provided bolts from the EV Kube to secure the post + top plate assemble to the EV Kube foundation