The M20 Load Management Controller continuously monitors a building’s primary power demand.
Any available capacity beyond this demand is automatically allocated to the charging stations and, consequently, to the electric vehicles. This ensures optimal use of the existing electrical infrastructure, while new buildings can be designed with a lower grid connection capacity. The result is reduced resource consumption, lower investment costs, and greater sustainability.
- Phase-correct load management to prevent phase imbalance
- Supports up to 15 charging clusters (e.g. sub-distribution boards in multi-level parking garages) with individually configurable load limits
- Full connectivity via OCPP over LAN or 4G/LTE
- Centralized configuration of the charging infrastructure through a web interface
- Compatible with KeContact P40, P40 Pro, P30 x-series (as client), and P30 c-series
- The large will support up to 200 chargers
Dimensions: 189 mm x 33 mm x 128 mm; weight 700 g










