matt:e IP-EVCP-TC80 Single phase IP65 rated connection centre for loads up to 32A with load curtailment at 80A.

£198.66
{£238.39} Inc VAT

SKU: IP-EVCP-TC80 Category: Tags: , Brand:

matt:e IP-EVCP-TC80 Single phase IP65 rated connection centre for loads up to 32A with load curtailment at 80A. 

The IP-EVCP-TC from Matt:E is an IP65 rated, simple single connection centre that allows for the connection of 1x 32A single-phase charge point to the existing PME earthing facility without the use of Earth electrodes, saving time during survey and installation.

It incorporates a unique monitoring device that disconnects all poles including CPC in the event of a broken Neutral fault in line with Regulation 722.411.4.1(iv) and has the optional additional functionality for load curtailment in line with Regulation 722.311.20, isolating the charge point from the supply once the house consumption rises above the pre-set limit (80A) and automatically restores the power to the charge point when the load falls back to a satisfactory level.

Product Features and benefits

  • Load management unit with hard-wired Current Transformer
  • Whole House Consumption Limiting, factory set at 80A
  • Built in Matt:E technology
  • No Earth electrodes required
  • Current transformer with simple plug-and-play connection
  • Built-in 100A isolator
  • Designed and built in the UK
  • BS:7671 2018 Amendment 1 2020 compliant

Specifications

    • Product Type – EV House Consumption Limiting 60A Connection Centre
    • Incoming Supply Rating- 32A
    • MCB Included- No
    • RCBO/RCCB Included- No
    • Max Terminal Entry- Input: 2.5mm² to 25mm², Output: 2.5mm² to 10mm²
    • Warranty- 3 years
    • Colour- Light grey
    • Weight – Approx. 3kg
    • Dimensions (H x W x D) – 300 x 200 x 129mm
    • Voltage Rating – 230V, single phase
    • Frequency- 50Hz
    • Material – ABS-HB flame retardant plastic
    • IP Rating – IP65 (outdoor)
    • Number of ways – 1
    • Build Type – Pre-configured connection centre
    • Main Incoming Supply – Single-phase (230V)
    • Load Curtailment – Yes
    • Protection Included – Terminals only

 

Downloads

IP-EVCP-TC(XX)

Delivery information

This product is delivered directly from the manufacturer, and will be prepared to your specific order.

Dispatch is 4-7 days from the date of order, and delivery is a 24 hour service.

Any available delivery tracking information will be added to your order, and emailed automatically, as soon as it is available.

Made to Order

This item is made to order, or shipped from overseas to order.  Please expect a 3-5 working day lead time before dispatch.

Under our Returns policy, this items is not eligible for return, for either business customers or consumers.