All 3-Phase EV Chargers

Brand
Connectivity Data
Cable Type
Cable
Cable CSA
Cable Management
Charger Post Brand
Charging Cable Length
CU Components
Inverter Type
Inverter Rated Power
IP Rating
Matt:e Range
Mount Type
No. Cores
Payment Terminal
Power Output
Sold Per
Tariff Compatible
Test Equipment
Tethered Cable
Tools
Accessory Type
Lighting Type
Battery Capacity
Warranty
Stock Status
Showing 49-64 of 120 results
  • CTEK Chargestorm® Connected 3 7-22kW dual output. 40-647
    £1,715.00
    {£2,058.00} Inc VAT
  • CTEK Chargestorm® Connected 3 7-22kW Single Output. 40-645
    £905.00
    {£1,086.00} Inc VAT
  • Capture 20 1500x1500 Opaque
    £470.00
    {£564.00} Inc VAT
  • NexBlue Delta Max UK 22kW (MID) Black
    £605.00
    {£726.00} Inc VAT
  • Screenshot 2025 11 08
    £1,150.00
    {£1,380.00} Inc VAT
  • Original price was: £510.00.Current price is: £495.00.
    {£594.00} Inc VAT
  • Tesida 3-Phase 32A 22kW Tethered Wall Box with Load Management, RFID, 4G, LAN and Wi-Fi
    £495.00
    {£594.00} Inc VAT
  • Tesida 3-Phase 32A 22kW untethered Dual Wall Box with Dual 11kW, RFID, 4G, LAN and Wi-Fi
    £1,250.00
    {£1,500.00} Inc VAT
  • Tesida 3-Phase 32A Dual Outlet 11kW Tethered RFID Wall Box
    £1,600.00
    {£1,920.00} Inc VAT
  • Ratio io6 22kW EV Charge point, type 2 socket - wifi. io622SKT - W
    £550.00
    {£660.00} Inc VAT
  • Ratio EV io7 Twin Socket 22kW CT Metering Photocell. io7T22C15PCST
    £2,250.00
    {£2,700.00} Inc VAT
  • Ratio io8
    £2,250.00
    {£2,700.00} Inc VAT
  • Ratio EV io7 Twin Socket 22kW MID Metering Photocell. io7T22M15PCST
    £2,500.00
    {£3,000.00} Inc VAT
  • Ratio io8
    £2,500.00
    {£3,000.00} Inc VAT
  • Zaptec PRO 22kW EV charge point (complete). 900-00021 + ZM000438
    £749.00
    {£898.80} Inc VAT
  • Garo Dual Entity 3-phase, 22KW Socket. EPCSO00332SIGIO
    £2,050.00
    {£2,460.00} Inc VAT